Logout?

Log Out

Are you sure to log out ?

BACK Return
OKLog Out Confirmed
Automation Solution
It's simple to accomplish automation.
Hartford automation is your priority solution.


test



Options of Automatin Diversity

test

RC1

test

RC2

test

RP series

test

RC3

Automation Accomplishment is simple and viable for you.


Options of diversity of automation package served to provide you most efficiency along with muliple customers success and accomplishment. 

test

RC1

Simple Way of Automation Accomplishment

Scenario: 

Interface PRO-V1 

  • 5 kgs Maximum workpiece weight, and 2 x 2 kg ( Double Clamp )
  • Fixed materials storage 800 x 600 mm
  • It is unnecessary to use safety fence.
  • Workable along with 4th-axis machining

Features:

  • Diversity production
  • Small amount of mass production 
  • Easy to change production pipeline
  • Minimum layout space 


test

test

RC 2

Flexible Strategy of Automation

Scenario:

PRO-V2 Interface

  • 10 kg Maximum workpiece weight, or 2 x 4 (Double Clamp)
  • Fixed materials storage 800 x 600 mm 
  • Intelligent Tools Module on Broken Tools Inspection and Detection 

Features:

  • Medimum quantity of mass production
  • Changeable materials plates served to improve cost efficiency of production line management
  • 2 production phases for machining, and avoids dicontinued operation
  • Utilization is raised because machines are unnecessary to be stopped to change broken tools randomly.



test

RC 3

High Productivity and High Utilization of Automation

Scenario:

PRO - V 2 Interface

  • 10 kg Maximum Workpiece Weight, or 2 x 4 kg (Double Clamp)
  • Drawer Type Materials Storage along with 2 carts. 50 kg Maximum Load per each drawer of cart.
  • Inspection Station
  • Intelligent Tools Change Module of Broken Tools Inspection and Detection.

Features:

  • Mass production for machining 
  • Machines are unnecessary to be stopped to load materials 
  • High storage volume and low layout space taken per drawyer type materials storage
  • High positioning function of materials storage cart, and storage change can be finished in 2 minutes.
  • Utilization of Robotic Arms is enhanced per 1 robotic arm on 3 machines load/unload. 
  • Productivity is raised because machines are unnecessary to be stopped to change broken tools randomly.


test

RM 20

One-Station Type Automation

Scenario: 

PRO - V 1 Interface

  • 10 kg maximum workpiece weight, or 2 x 4 kg ( Double Clamp )
  • Rotating materials storage can stack workpieces.
  • Round shape workpiece D 20~100, height of materials placed 400 mm
  • Automatic QC Inspection
  • Cleaning Station 

Features:

  • High flexbility to change materials, and it avoids production change at times.
  • Materials storage can stack large volumen of materials, and period of time of materials prepared is extended. 
  • Cleaning Station can help saving time of labor force arrangement.
  • Online Automatic QC System ensures most machining quality. 
  • 9.5% plus of Utilization rate is raised per entire automation facility. 


test

RP series

Tray Type of Automation

Scenario

PRO- V1 Interface

5A - 95Q

  • 500 kg Maximum Moveable Weight ( Workpiece includes tray)
  • Maximum workpiece dimension :Ø 600 mm x H 400 mm
  • 10 storage grid along with 1 load/ unload station 
  • Tooling Tray can be storaged  6 pcs of HSK A 63

Features: 

  • NC Control/ Storage Management/ Intelligent Dispatch just within 1 controller management
  • Mixed storage system design can improve management on tools and workpieces
  • Sequence management on priority workpiece per orders 
  • 10% plus of utilization rate is enhanced on entire Automation facility.



test

Efficacy of Intelligentization Automation

Customer Success of DMC/ Bridge Mill

Scenario:

  • PRO - V 2 Interface
  • HSA - 2212
  • 500 kg of Robotic Arm
  • Magnetic Fixture
  • Pallet type materials storage
  • Workpiece: Safety Windows
  • Dimension:1590 x 1590 x 20
  • Weight:200 kg
  • Machining : Drilling / Tapping / Side Milling

Efficacy of Automation 

  • 75% time is saved ( Previous opeation time: 44 min compared with 11-minute operation time after automation was employed)
  • 3 Workforce is reduced ( Previous operation needs 4 persons compared with 1 person after automation was employed)

You May Like
You May Like